Statement of System Performance
Ref - Paragraph 20.8 of Transmission and Bulk Supply License
A quarterly report on performance of the system, with reference to each
standard shall be submitted to OERC within 25 days of end of each quarter
i.e. by 25th of April, July, October and January each year. An annual
report on the year ending 31st March shall be submitted by 25th April
along with the report on the first quarter report. The report shall
contain the following information.
A. Power Supply Security
-
Percentage of time (total hours in the quarter) load-restrictions
were applied due to non-availability of generation of Regional Pool
Power.
-
In each case, on daily basis, particulars of the generating station
of Regional Pool, which failed to meet dispatch or forecasted
requirement.
-
In each case, the estimated amount of demand curtailed and areas or
consumer categories which were affected.
B. Transmission Security
-
Percentage of time (total hours in the quarter) load restrictions
were applied, due to non-availability of transmission capacity, even
though generation/Regional Pool capacity was available.
-
Percentage of time (total hours in the quarter) generation had to be
rescheduled, due to non-availability of transmission capacity, even
though load restriction was not required.
-
In each case the transmission element (e.g. line, transformer,
circuit breaker etc.) which was not available, resulting in loss of
transmission capacity. The reason for non-availability of the
transmission element (e.g. scheduled maintenance outage, unscheduled
maintenance outage, forced outage, with details) shall be furnished.
-
In each case the Grid sub-station affected, the extent of generation
rescheduling required, estimated capacity restriction effected,
area/consumer categories affected.
C. Overall Performance
1) Frequency
-
Percentage of time (total hours in the quarter), grid frequency was
(i) above higher value permitted under IE Rules, 1956, (ii) below
lower value permitted under IE Rule, 1956.
-
The maximum continuous period of deviation, with date and time and
reason for such continuous deviation.
-
The highest and lowest grid frequency observed, value, time and date
of occurrence. In case this was accompanied by islanding of the
network, details of the event resulting in such islanding shall be
furnished.
2) Voltage
-
Percentage of time voltage at outgoing 33/11 kV lines of any grid
sub-station was beyond levels permitted under IE Rules, 1956.
-
In each case, reasons for such deviation, the Grid sub-station
affected and maximum continuous period of deviation, with date and
time to be reported.
-
The highest voltage and the lowest voltage, if beyond limit
permitted under IE Rules, 1956 with date and time and grid sub-station
where it occurred shall be reported along with % tap position of the
concerned Interconnecting transformer and Load transformer.
f3gh54ehyxp3c1t|267
f3gh54ehy8|0000BBCCFDB8|TBL_MENUPAGE_MST|MP_CONTENT|BFF699E4-A629-481B-88C8-14D85E441944
2xa6rfxhi8|0000BBCCFDB8|TBL_MENUPAGE_MST|MP_CONTENT|9D758AF7-A04A-4095-887A-5F081F7F8A0B