GRID CODE
VERSION 9
Approved by OERC
CONTENTS
GRID CODE
REVISION SCHEDULE
1. INTRODUCTION
2. DEFINITIONS
3. MANAGEMENT OF THE ORISSA GRID CODE
4. SYSTEM PLANNING
5. CONNECTION CONDITIONS
6. OUTAGE PLANNING
7. SCHEDULE AND DESPATCH
8. FREQUENCY AND VOLTAGE MANAGEMENT
9. MONITORING OF GENERATION AND
DRAWAL
10. CONTINGENCY PLANNING
11. CROSS BOUNDARY SAFETY
12. OPERATIONAL EVENT/ACCIDENT
REPORTING
13. PROTECTION
14. METERING,
COMMUNICATION AND DATA ACQUISITION
15. DATA REGISTRATION
-------------------------------
GRID CODE REVISION SCHEDULE
REVISION NUMBER |
DATE ISSUED |
SECTION(S) REVISED |
1 |
02.06.98 |
2(drawal), 2(IPP), 2(Licensee), 2(OHPC),
2(PPA)
|
1 |
02.06.98 |
3.4.7
|
1 |
02.06.98 |
7.3
|
1 |
02.06.98 |
8.5
|
1 |
02.06.98 |
12.4.1(ii), 12.4.1(iii), 12.4.1(iv), 12.4.2,
12.5, 12.6, 12.7
|
1 |
02.06.98 |
13.4, 13.5, 13.7, 13.7.4, 13.11
|
1 |
02.06.98 |
14.2, 14.3.2, 14.3.4, 14.3.5, 14.4.2, 14.5.1,
14.5.2, 14.6.4, 14.6.6,
14.6.8, 14.6.9, 14.6.10, 14.6.11, 14.6.12, 14.7.4, 14.7.7, 14.7.8,
14.7.9, 14.8, 14.9.3, 14.9.4, 14.10, 14.10.1
|
1 |
02.06.98 |
15.1, 15.2, 15.3, 15.5, 15.6, 15.7
|
1 |
02.06.98 |
A.1.1, A.1.1.1(ii), A.1.1.3, A.1.1.4(iii),
A.1.1.4(iv), A.1.2.3, A.1.2.4(iii), A.2
|
1 |
02.06.98 |
B.1.1.4(d)(v), B.1.1.4(d)(vi), B.1.2.1(ix)(b)(i),
B.1.2.1(ix)(b)(ii)
|
1 |
02.06.98 |
B.1.2.1(c), B.1.2.2(i), B(Part-2), B.1.3,
B.2.1(i)
|
1 |
02.06.98 |
C.1.3.5, C.3(i), C.5
|
1 |
02.06.98 |
D(ii)
|
1 |
02.06.98 |
E(ii)
|
2 |
20.08.98 |
2(Outage)
|
2 |
20.08.98 |
3.4
|
2 |
20.08.98 |
5.4
|
2 |
20.08.98 |
7.4, 7.6
|
2 |
20.08.98 |
8.4
|
2 |
20.08.98 |
12.4
|
2 |
20.08.98 |
Appendix
|
2 |
20.08.98 |
13.3
|
2 |
20.08.98 |
13.4
|
3 |
01.12.98 |
3.5
|
3 |
01.12.98 |
11.5
|
4 |
30.12.98 |
14.7.5
|
5 |
20.05.00
|
2 (Central Sector
Generation), 2 (Generator), 2 (Inter State Generating Station (ISGS))
|
5
|
20.05.00
|
3.4
|
5
|
20.05.00
|
6.3, 6.4
|
5
|
20.05.00
|
7.1, 7.2, 7.3, 7.4
|
5
|
20.05.00
|
8.1, 8.2(ii), 8.3, 8.4
|
5
|
20.05.00
|
C1.1(i), C1.1(ii), C1.1(iii)
|
6
|