| STATEMENT OF SYSTEM
    PERFORMANCE Ref - Paragraph 20.8 of Transmission and Bulk Supply License A quarterly report on performance of the system, with reference to each
      standard shall be submitted to OERC within 25 days of end of each quarter
      i.e. by 25th of April, July, October and January each year. An annual
      report on the year ending 31st March shall be submitted by 25th April
      along with the report on the first quarter report. The report shall
      contain the following information. A. Power Supply Security 
        
          Percentage of time (total hours in the quarter) load-restrictions
          were applied due to non-availability of generation of Regional Pool
          Power.
          In each case, on daily basis, particulars of the generating station
          of Regional Pool, which failed to meet dispatch or forecasted
          requirement.
          In each case, the estimated amount of demand curtailed and areas or
          consumer categories which were affected. B. Transmission Security 
        
          Percentage of time (total hours in the quarter) load restrictions
          were applied, due to non-availability of transmission capacity, even
          though generation/Regional Pool capacity was available.
          Percentage of time (total hours in the quarter) generation had to be
          rescheduled, due to non-availability of transmission capacity, even
          though load restriction was not required.
          In each case the transmission element (e.g. line, transformer,
          circuit breaker etc.) which was not available, resulting in loss of
          transmission capacity. The reason for non-availability of the
          transmission element (e.g. scheduled maintenance outage, unscheduled
          maintenance outage, forced outage, with details) shall be furnished.
          In each case the Grid sub-station affected, the extent of generation
          rescheduling required, estimated capacity restriction effected,
          area/consumer categories affected. C. Overall Performance 1) Frequency 
        
          Percentage of time (total hours in the quarter), grid frequency was
          (i) above higher value permitted under IE Rules, 1956, (ii) below
          lower value permitted under IE Rule, 1956.
          The maximum continuous period of deviation, with date and time and
          reason for such continuous deviation.
          The highest and lowest grid frequency observed, value, time and date
          of occurrence. In case this was accompanied by islanding of the
          network, details of the event resulting in such islanding shall be
          furnished. 2) Voltage 
        
          Percentage of time voltage at outgoing 33/11 kV lines of any grid
          sub-station was beyond levels permitted under IE Rules, 1956.
          In each case, reasons for such deviation, the Grid sub-station
          affected and maximum continuous period of deviation, with date and
          time to be reported.
          The highest voltage and the lowest voltage, if beyond limit
          permitted under IE Rules, 1956 with date and time and grid sub-station
          where it occurred shall be reported along with % tap position of the
          concerned Interconnecting transformer and Load transformer. |